4.15.3.1. Catalog update
(Tutorial) - Example 1
When using an ERP
integration, in the LinkDB, datasets are assigned to a certain project row
(project path + LineID).
At catalog
updates it may happen that not all LinkDB connections for each project can
be found due to changes.
![[Note]](images/note.png) | Note |
|---|
You will find the sample files for this tutorial in your installation under $CADENAS\training\update_manager. The "ecat" role from the demo database was used for text and images. For the "classic" red/green display, the corresponding settings were made under Status colors for catalog index.[77]
In this example, the following setting was used for the export condition [Export condition].[78]
(ERP_PDM_NUMBER.NE.'')
The traffic light is therefore green if an ERP_PDM_NUMBER is available.
|