4.2.2. Catalog update with ERP integration

4.2.2.1. Standard check
4.2.2.2. Detailed check of table and 3D view
4.2.2.3. Further information on catalog update

With an existing ERP integration the datasets of the LinkDB are assigned to certain project lines (project path + line ID).

During a catalog update, normally the datasets in the LinkDB are automatically assigned to the projects and lines of the new version. However, sometimes the assignment is not possible.

Reasons may be: